
Shop pad build — Waller, TX
- Scope
- 60x40 compacted pad with drainage fall away from the slab
- Equipment
- Excavator, skid steer, vibratory roller
- Timeline
- 3 days
Pad passed the builder's elevation check on the first walk and stayed dry through the next rain.


